PUBLIC ENTERPRISE, 2017, ISSUE 23., VOL.1, ARTICLE 3

search faster through the content

MIM3: Methodology of Innovation Management for Obtaining the Level 3 of I2MM

Authors

Emigdio Alfaro
CENTRUM Católica Graduate Business School, PUCP, Lima, Peru
Received December 2016; Revised May 2017; Accepted June 2017
https://doi.org/10.21571/pehyj.2017.2301.03

Abstract

The purpose of the present study is to develop a methodological proposal for improving the management of the innovation maturity for obtaining the level 3 of the Integrated Innovation Maturity Model (I2MM), considering an integrated methodological approach which includes the good management practices of the following management areas: (a) strategic management, (b) project management, (c) innovation models and innovation methods, (d) standards for innovation management, (e) knowledge management, and (f) financial management. As a result, MIM3 (the Methodology of Innovation Management for obtaining the level 3 of the I2MM in the organizations) is presented.

Keywords

Innovation management, innovation maturity, methodology, project management, innovation
standards, I2MM.

Reference to this paper should be made as follows: Alfaro, E. (2017). MIM3: Methodology of Innovation Management for Obtaining the Level 3 of I2MM. Public Enterprise, 23(1), 31-83.
https://doi.org/10.21571/pehyj.2017.2301.03